Some projects done by aban Company:

Some projects done by aban Company:

* Quality Assessment Project of Sludge Treatment Plants in Tehran Province./

*Project of commissioning metal refineries of Amirkabir Dam and Power Plant Operation Office with a capacity of 120 cubic meters per day.

* Design and construction of sanitary-human wastewater treatment plant of Hara Institute affiliated to Khatam Al-Anbia Camp located in Kondar village with a capacity of 150 cubic meters per day.

* Design and construction of sanitary-human (metal) wastewater treatment plant of the General Administration of Ports and Maritime Affairs of Bushehr province with a capacity of 100 cubic meters per day.

* Design and construction of sanitary-human (metal) wastewater treatment plant of Roof Terrace factory with a capacity of 400 cubic meters per day.

* Design and construction of sanitary-human (metal) wastewater treatment plant of Sanghar Mines Company with a capacity of 350 cubic meters per day.

*Design and construction of sanitary-human (metal) wastewater treatment plant of Rajabi lock factory with a capacity of 150 cubic meters per day./

* Design and construction of sanitary-human (metal) wastewater treatment plant of General Mechanics Alborz Tunnel Company – located in Gachsar with a capacity of 100 cubic meters per day

*Sanitary-human wastewater treatment package with a capacity of 7 cubic meters per day

(Fiberglass) Morad Yaran factory located in Bam, Kerman.

*Sanitary-human wastewater treatment package with a capacity of 7 cubic meters per day. (Fiberglass) Arian Shimi factory located in Khazarshahr, Sari./

* Sanitary-human wastewater treatment package with a capacity of 1500 liters per day. (Fiberglass) Mangrove Institute – Tehran Metro Line 7.

* Sanitary-human wastewater treatment package with a capacity of 1500 liters per day. (Fiberglass) Mesinan Gostar Kerman Company – located in Sarcheshmeh Copper.

Aegean Pump wastewater pre-treatment package with a capacity of 20,000 liters per day. (Metal) located in Lea industrial town – Qazvin.

* Wastewater treatment package with a capacity of 100 cubic meters of Kabul Heart Surgery Hospital. Location Kabul Afghanistan

* 2 stainless steel hardeners with a capacity of 150 cubic meters per hour. Soya Sun Hashtgerd Company./

*Reverse osmosis drinking water treatment package with a capacity of 10,000 liters per day – Construction Chemical Company located in Simin Dasht industrial town.

* Reverse osmosis drinking water treatment package with a capacity of 40,000 liters per day – Etemad Sholeh Engineering Technical Company located in Hashtgerd.

*Reverse osmosis drinking water treatment package with a capacity of 40,000 liters per day – Paya Plast Iranian Company located in Eshtehard.

* Aquatic Techno Company: 1 RO device with a capacity of 650 cubic meters per day, Basra, Iraq

*Mr. Gol Mohammad: RO device with a capacity of 100 cubic meters per day, the installation site of the device in Afghanistan

* Oil Company: Polyethylene package with a capacity of 256 cubic meters per day, installation site of Sarakhs machine

*Sweet Honey Agriculture and Industry: RO machine with a capacity of 1000 cubic meters per day, place of installation of Shabestar machine

* Shrine of Hazrat Ali: RO device with a capacity of 150 cubic meters per day, Najaf Ashraf installation *site Whistle Machine Company: 1 RO machine with a capacity of 150 cubic meters per day, installed in Bolivia

* Artavil Converters Co.: Wastewater treatment package with a capacity of 40 cubic meters per day, RO machine with a capacity of 25 cubic meters per day, Erbil Erbil, Iraq

*1 RO machine with a capacity of 150 cubic meters per day, installed in Bolivia

 

 

 